
Engineering
Engineering
The Engineering Department is the contract manager for the construction of municipal facilities associated with new developments and other city construction. It is responsible for the city's proposed improvements and collecting bids for these improvements. Additionally the members of this department also perform a variety of professional, technical and inspection services on various aspects of the city's infrastructure.
The Engineering Department also oversees and monitors the city's stormwater management and works in conjunction with the Okabena-Ocheda Watershed District and the Heron LakeWatershed District to do so.
If requesting Excavation Permits or Sewer Permits, you must contact the Engineering Department: 507-372-8640.
LINK FOR 3RD AND 4TH AVENUE PROJECT WEBSITE https://clients.bolton-menk.com/worthington3rdand4th/
Documents & Forms
Title | Download File |
---|---|
City of Worthington SWPPP Document | Wgtn_MS4_General Permit.pdf |
County Ditch 12 Flood Mitigation Study | Industrial Park Drainage and Flood Mitigation Study_5-23-13.pdf |
County Road 57/TH 60 Area Infrastructure Report | CR57_TH60 Master Plan Report.pdf |
North Industrial/Commercial Park Master Corridor Study | TH59NorthMP.pdf |
Okabena Lake Diagnostic Study | Okabena Final Report 2015-03-11.pdf |
Location
303 Ninth Street
Worthington, MN 56187
8:00 A.M. - 5:00 P.M., Monday through Friday
|
Contacts
Hyunmyeong Goo
City Engineer
(507) 372-8640
|
Marilyn Cilengi
Assistant City Engineer
(507) 666-5019
|
Meredith Vaselaar
Administrative Assistant
(507) 372-8640
|
Stephen Schnieder
Engineer Emeritus
(507) 372-8640
|
Groups
Engineering Department
(507) 372-8640
|